Diagnosis of the Active Duration of the Secondary Arc Caused by a Single-phased Fault in order to Reclose the Transmission Lines Using the Hybrid Method

Document Type : Original Article

Authors

Faculty of Electrical and Computer Engineering, Mazandaran University of Science and Technology, Behshahr, Iran

Abstract

The importance of studying transient single-phased faults due to the high statistics of this phenomenon in the power transmission system requires that special attention be paid to the operation of the automatic reclosing relay. If an adaptive automatic reclosing relay is used instead of the conventional delay type, the reliability of the power system will be improved. To achieve this goal, it is necessary to determine the exact time of the secondary arc shutdown in order to determine the dead time of the reclosing relay. There are various indicators such as changes in the waveform of the faulty phase voltage, changes in the amplitude of odd harmonics of the voltage wave, THD% index, and changes in the voltage angle of the faulty phase to determine the extinguishing time of the secondary arc. The proposed algorithm in this article uses a hybrid method and a simultaneous measurement of indicators in order to ensure the shutdown of the secondary arc to issue the reclosing command by the relay. To test and validate the proposed method, one of 400 kV transmission lines is considered as a power system under study and simulated through EMTP-RV software. The obtained results imply that the secondary arc extinguishing time, using the proposed method, is much less than the constant dead time included in the conventional delay type recloser protection settings.

Keywords

Main Subjects


[1] Ahn, S. P., Kim, C. H., Aggarwal, R. K., Johns, A. T., "An alternative approach to adaptive single pole auto-reclosing in high voltage transmission systems based on variable dead time control", IEEE Transactions on Power Delivery, Vol. 16, No. 4, pp. 676-686, Oct. 2001, https://doi.org/10.1109/61.956756.
[2] Fakheri, A. J., Grzan, J., Shperling, B. R., Ware, B. J., "The use of reactor switches in single phase switching", CIGRE Report 31-06, 1980.
[3] Sun, Q., Yin, J., Wang, F., Yan, J., and Li, Q., Chen, S., "Influence of grading capacitor of multiple-break circuit breaker on the extinction of secondary arc – a new method for reducing dead time", IET Generation, Transmission & Distribution, Vol. 11, No. 8, pp. 1954-1965, May 2017, https://doi.org/10.1049/iet-gtd.2016.1295.
[4] Goda, Y., Matsuda, S., Inaba, T., Ozaki, Y., "Forced extinction characteristics of secondary arc on UHV (1000 kV class) transmission lines", IEEE Transactions on Power Delivery, Vol. 8, No. 3, pp. 1322-1330, July 1993, https://doi.org/10.1109/61.252658.
[5] Kassakian, J. G., "The effects of non-transposition and earth return frequency dependence on transients due to high speed reclosing", IEEE Transactions on Power Apparatus and Systems, Vol. 95, No. 2, pp. 610-620, March 1976, https://doi.org/10.1109/T-PAS.1976.32142.
[6] Kappenman, J. G., Sweezy, G. A., Koschik, V., Mustaphi, K. K., "Staged fault tests with single phase reclosing on the winnipeg-twin cities 500KV interconnection", IEEE Transactions on Power Apparatus and Systems, Vol. PAS-101, No. 3, pp. 662-673, March 1982, https://doi.org/10.1109/TPAS.1982.317281.
[7] Dillard, J. K., Clayton, J. M., Kilar, L. A., "controlling switching surges on 1100-Kv transmission systems", IEEE Transactions on Power Apparatus and Systems, Vol. PAS-89, No. 8, pp. 1752-1762, Nov. 1970, https://doi.org/10.1109/TPAS.1970.292759
[8] Boisseau, A. G., Wyman, B. W., Skeats, W. F., "Effect of deionization time on reclosing circuit breakers", Electrical Engineering, Vol. 69, No. 4, pp. 346-350, April 1950, https://doi.org/10.1109/EE.1950.6433793.
[9] Paul, D., Goswami, A. K., Rout, P. K., Prakash, S., "Modelling of Logic Circuit for Enabling High Speed Auto Reclosure of High Voltage System", IEEE International Conference on Power Electronics, Drives and Energy Systems (PEDES), Chennai, India, 1-6, 2018, https://doi.org/10.1109/PEDES.2018.8707711.
[10] LIANG, Z., WANG, K., LI, W., "Research on phase-by-phase adaptive reclosing sequence for transmission lines", IEEE 8th International Conference on Advanced Power System Automation and Protection (APAP), Xi'an, China, pp. 1389-1393, 2019, https://doi.org/10.1109/APAP47170.2019.9225162.
[11] Ahmad Khan, W., Rehman, B., Rehman, A. u., Nasir, M., Abid, M. I.," A continuous wavelet and fast fourier transform-based single-phase adaptive auto-reclosing scheme for ehv transmission lines", Electrical Engineering, Vol. 105, pp. 1347-1361, january 2023,  https://doi.org/10.1007/s00202-023-01737-2.
[12] Nikoofekr, I., Sadeh, J., "Determining secondary arc extinction time for single-pole auto-reclosing based on harmonic signatures", Electric Power Systems Research, Vol. 163, Part A, pp. 211-225, October 2018,  https://doi.org/10.1016/j.epsr.2018.06.013.
[13] Zadeh, M. R. D., Voloh, I., Kanabar, M., Xue, Y., "An adaptive HV transmission lines reclosing based on voltage pattern in the complex plane", IEEE 65th Annual Conference for Protective Relay Engineers, College Station, TX, USA, 2012, https://doi.org/10.1109/CPRE.2012.6201223.
[14] Radojevic, Z. M., Shin, J. R., "New Digital Algorithm for Adaptive Reclosing Based on the Calculation of the Faulted Phase Voltage Total Harmonic Distortion Factor", IEEE Transactions on Power Delivery, Vol. 22, No. 1, pp. 37-41, Jan. 2007,  https://doi.org/10.1109/TPWRD.2006.886781.
[15] Johns, A.T, Aggarwal, R.K., Song, Y.H., "Improved techniques for modelling fault arcs on faulted EHV transmission systems", IEE Proc.-Gener. Transm. Distrzb., Vol. 141, No. 2, pp. 148–154, March 1994,  https://doi.org/10.1049/ip-gtd:19949869.
[16] Ge, Y., Sui, F., Xiao, Y., "Prediction methods for preventing single-phase reclosing on permanent fault", IEEE Transactions on Power Delivery, Vol. 4, No. 1, pp. 114-121, Jan. 1989, https://doi.org/10.1109/61.19197.
[17] Schavemaker, P. H., Sluis, L. V. D., "The Arc model Blockset", Proceedings of the Second IASTED International Conference, Power and Energy Systems (EuroPES), Crete, Greece, June 2002.