Abstract

Making targeted subsidies and the process of releasing energy market and specified criteria for the quality of energy delivered to consumers shows the necessity for the explanation of energy production in Iran. In the meantime, thermal power plants produce about 85% of electricity in Iran. Steam and gas turbine power plants have created the vast capacity of power generation in thermal plants, but the significant portion of this generated power is not in the sense of new energy policy. Therefore, the reconstructing and improvement of thermal power plants has undeniable importance. In this paper, considering two major methods in reconstructing thermal power plants, eligible power plants are presented. Results are discussed according to important economic parameters like electricity generation costs, capital return rate, cost benefit, annual interest, etc. Further, estimation of changes in target plants in terms of technical and economic characteristics has an effective role in our decisions, i.e. changes are affected by the features of current plants and their potentials. The efficacy of reconstructing average efficiency, capacity, and electricity generation costs can be the effective parameters in future management decisions.

Keywords


[1] Mehrpanahi, A., Hosseinalipour, S. M., Rezapor, K.,"The Effect of Targeted Subsidies on Economic Characteristics of Steam Power Plants". Conference on Energy Management and Optimization, Tehran, Iran, 2010. [2] Mehrpanahi, A., Hosseinalipour, S. M., Rezapor,K.,"Analysis of Situation of Gas Turbine Power Plant on Making Targeted Subsidies Process", 25TH International Power System Conference on Electrical, Tehran, Iran, 2010. [3] Hosseinalipour, S. M., Mehrpanahi, A., "Economic Study of Repowering of Steam Power Plant Compared with Construction of Gas Turbine Power Plant", Iranian Journal of Energy, No. 33, page: 41-62, 2009. [4] Solamian, Z., Kordbacheh, M., SadeghiShahdani, M., Mokarizadeh, V.,"Total Cost Calculations Based on on Making Targeted Subsidies Process in Iran", 20TH International Power System Conference on Electrical, Tehran, Iran, 2009. [5] Ghahramani, S., Fateh, A.,"Economic Comparison of Cost of Energy Production in Distributed Generation in Iran Power Plants", 23TH International Power System Conference on Electrical, Tehran, Iran, 2008. [6] Tavanir Organization", Iran Detailed Statistics of Electricity Industry, for Strategic Management in 2008", [online]. Available from: www.amar.tavanir.org.ir. Accessed 21 November 2013. [7] Kudlu, N., "Major Options and Considerations for Repowering with Gas Turbines", Electric Power Research Institute, BETCHEL Project Report. 1989. [8] Mehrpanahi, A., Hosseinalipour, S. M., Mobini, K.,"Investigation of The Effects of Repowering Options on Electricity Generation Cost on Iran Steam Power Plants", International Journal of Sustainable Energy, Vol. 32 No.4, pp.229-243, 2013. [9] Sanaye, S., Hamzee, Y., "Techno-Economic Modeling and Optimization of Recovery of Steam Power Plants Using Gas Turbine", 20TH International Power System Conference on Electrical, Tehran, Iran, 2005. [10] Brandr, J. A., Chase, D. L.,"Repowering Application Consideration", ASME – Journal of Engineering for Gas Turbines and Power, 114, 643–652, 1992. [11] Chase, D. L., Kovacik, J. M., Stoll, H. G.,"Theeconomic of Repowering Steam Turbines", GE Company, 1991. [12] Moore, T., Repowering as Competitive Strategy. EPRI Journal, September, 6–13, 1995. [13] Sarabchi, K., Nabati, H.,"Thermodynamics Investigation of Steam Power Plant Conversion to Combined Cycle Power Plant", 8th Iranian Annual Mechanical Engineering Conference, Tehran, Iran, 2000. [14] Pace, S., Graces, D., Stenzel, W.,"Strategic Assessment of Repowering", Interim Report. Electric Power Research Institute, 1997. Available from: http://my.epri.com/portal/server.pt?Abstract_id=TR-106908. [15] Stenzel, W., Sopocy, D. M., Pace, S.,"Repowering Existing Fossil Steam Plants", EPRI, 1997. Available from: http://www.soapp.com/papers/Repowering_Fossil_Plants.pdf. [16] Ploumen, P. J., Veenema, J. J., Epon, N. V.,"Dutch Experience with Hot Wind-Box Repowering", ASME, 96-GT-250, 1996. [17] Shahnazari, M. R., Foroughi, D., Fakhrian, H.,"Repowering of Lowshan Power Plant", IGTC Conference, Tokyo, 2003. [18] Walters, A. B., Craig, J. R., Herbster, R. E., Van laar, J.,"Repowering Options Study", Florida Power & Light Company Report, 1988. [19] Stoll, H. G., Smith, R. W., Tomlinson, L. O., "Performance and Economic Considerations of Repowering Steam Power Plants". GE Company, 1994. [20] Sanaye, S., Hamziei, Y, Malekian, M. R."Thermal and Economic Analysis of Besat Steam Power Plant Repowering", ASME Turbo Expo. doi:10.1115/GT2006-90720. pp:777-783, 2006. [21] Escosa, J. M., Romeo, L. M.,"Optimization CO2 Avoided Cost by Means of Repowering", Applied Energy Journal, Vol. 86, 2351–2358, 2009.