Develop A Framework for Prioritizing the Risks Involved in Oil and Gas Desalination Plant Using Combined Techniques of Fuzzy AHP and SWOT Model(Case Study : Naftshahr Desalination Plant). JEM. 2018; 8 (1)
URL: http://energy.kashanu.ac.ir/article-1-668-en.html
Abstract:  

Risk management is the process of systematically classify, identify, assess and respond to risks throughout the life cycle of a project, to gain maximum utility of elimination, prevention or risk control is. There are several risks in oil projects in the lack of checks and necessary planning; damages will be precious national resources. Given the importance of these projects and the critical impact of oil on different aspects of our life, extensive research is required to improve the reliability of planning in this field. More attention to identify and rank the risks involved in this area is crucial. In this regard, several techniques have been introduced. In this paper, a framework for prioritizing the risks involved in oil and gas desalination plant has been investigated. Identified risks in three areas: cost, safety and time of construction are classified. In the proposed framework and tools such as SWOT and FAHP is used. Finally, using a framework and actual data related to the Naftshahr desalination plant, the proposed approach for prioritizing identified 59 risk is used.

     
Type of Study: case report | Subject: management