Volume 1, Number 1 (energy managment 2011)                   JEM 2011, 1(1): 2-10 | Back to browse issues page


XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Gholami A, Ghazizadeh M S, Pakdaman J, Ansari M. Optimal sizing and operation of an industrial CHP system for a gas engine prime mover. JEM. 2011; 1 (1) :2-10
URL: http://energy.kashanu.ac.ir/article-1-21-en.html

Abstract:  
Distributed generation has recently received a great deal of attention in Iran, as a result of which CHP systems have been employed more, due to their higher efficiency. This article, aims to optimize the system size considering the operating strategy of an industrial case study. Size and operating strategy for the steam boilers are optimized. The problem has been solved by using GAMS software to optimize the Net Present Value (NPV) of the plant from the plant owner’s point of view. A sensitivity analysis has also been performed to illustrate the optimal solutions variation caused by altering several key parameters such as fuel and electricity prices.
Type of Study: Research | Subject: Special

Add your comments about this article : Your username or email:
Write the security code in the box

© 2015 All Rights Reserved | Energy Engineering Management

Designed & Developed by : Yektaweb